IBM Power7 Scale-Out Server

IBM Power 740 Express (8205-E6B / E6C / E6D)

You have a Power 740 Express. Here's what that means in 2026: a dual-socket scale-out Power7 box, out of IBM hardware support since 2019, running on borrowed time on IBM i 7.3.

Machine type: 8205-E6B / 8205-E6C / 8205-E6D Software tier: P10, P20

The Power 740 Express (8205-E6B, later E6C and E6D on the POWER7+ refresh) offered up to 16 cores across two sockets and up to 256 GB of DDR3 memory -- double the memory ceiling of the 730 in the same general form factor, making it the step-up choice for IBM i, AIX, and Linux shops that had outgrown a 730's memory capacity.

740 at a glance

Machine Type8205-E6B / E6C / E6D
Sockets2
Max Cores16
Max Memory256 GB DDR3

Where it stands in 2026

740 lifecycle status

MilestoneDateWhat It Means
End of standard IBM supportSeptember 30, 2019IBM no longer provides hardware maintenance, machine code updates, or security patches.
IBM i ceilingIBM i 7.3 onlyIBM i 7.4 dropped Power7 support entirely -- there is no OS upgrade path on this hardware.
IBM i 7.3 standard support endedSeptember 30, 2023Paid Service Extension available through September 30, 2028; no IBM support path after that.

Dates per IBM's Power7 end-of-service documentation and IBM i support lifecycle announcements.

See our maintenance page for third-party support options and our migration comparison for what a modern Power8/Power9/Power10/Power11 replacement looks like.

IBM no longer sells the 740 new. Used and refurbished units, replacement parts, and memory remain available through IBM i and AS/400 hardware resellers; third-party maintenance contracts extend hardware support 3-5+ years past IBM's own EOS date.